From: route@monster.com
Sent: Sunday, May 01, 2016 7:46 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: Dispatch Clerk
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
William Economou 4900 Airport Parkway
#2364, Addison, Texas
75001
cell (505) 980-7087
weconomou@yahoo.com
Experience: 30 years public works/private, project manager,
superintendent, real estate development with Don Tishman, scheduling, hard
bid / negotiated contracts, clean room, secure areas, high tech clients,
EVPM, TI, CQM-RMS 4/2011, FAR, LEED, NEPA, SWPPP, estimating,
scope/design to completion, entitlement, document control, bid assembly,
subcontract. Project size and volume 600,000 sqft- $80,000,000; Computer
literacy, Clearances: TWIC/BATC/GSA/FBI ‘Public Trust’ 2/11/2010: 1/17/13
Education:
Master of Business Administration,
Construction Management, courses equivalent to MSCM Civil Engineering &
Architecture Departments, The University of New Mexico, Albuquerque, New
Mexico.
Bachelor
of Arts, Business/Anthropology, Construction Management, University of
New Mexico AAS Construction Management Technologies Phi Theta Kappa
Honors, Central NM College formerly Albuquerque Technical Vocational
Institute, Albuquerque, New Mexico equals Junior status BS CECM Select Project History: Project Engineer, Potter Structures, Phase II Management
Addition, Cast In place 4 story with raised pier/beam foundation, University
of Texas-Dallas, Richardson, Texas; 2013 Quality Control & Safety Manager,
$13.8MM, Army Corps Bosque Restoration Army Corps of Engineers database
management software; reporting all typical project manager/engineer functions
for submittals, schedule update, site inspection, document control, SWPPP,
RFI, RFP, etc., 2011/12 Millwright: H-Y Tech Mechanical &
Construction; URENCO FF&E Facility build out, Eunice, NM 2011 Contract Project Manager, Department of the
Interior – Bureau of Indian Affairs Facilities, Scope Of Work for campus wide
renovations and new construction, Silver LEED, $10MM to $65MM, 2009/2010. Survey Layout Foreman, Brocade
Communications 600,000sqft concrete garage, elevators, site utilities, San
Jose, CA; Stanford Institute for Economic Policy Research Structural Steel
building, Pace Engineering Building, Seismic Retrofit historic renovation
Stanford University, Palo Alto, CA, 2008/2009 VP Operations & Chief Estimator, ramp
up GC, Safety protocols, SOPs, strategic market analysis, MEP, QA/QC
inspections, HR, site utilities, contracts, value engineering, procurement,
entitlements, buy out, execution of projects with tracking, and business
development for public works and LEED projects with business plan
implementation, increased volume 500% from previous annual performance, 2006
– 2008 Project Manager, Shotcrete, Seismic
retrofit, SOG, StrucSteel additions at Liberty Station Mall historic
property: US Marine Processing Station–Base Realignment and Closure;
Shotcrete retaining wall, PT SOG, caissons, University of San Diego dorms 200
units; budget, estimating, scheduling, contracts, 2005
Senior Project
Engineer, Monterey Bay Aquarium Research Institute, CIP 380,000 gallon Remote
Operated Vehicle test tank, soil cement columns, cathodic protection for
hydraulic elevator tubes, engineering challenge on the beach, saved $250,000
in concrete design changes, associated labs / offices, facilities upgrades,
Jib & Bridge Cranes specifications & purchasing, MEP, $10MM, 1999 /
2000 Townsend Tower TI San Francisco, CA, 1998 –
PT demo, add elevators, 60% occupied, data center LIHTC 200 Units 1997 $10M – Water
harvesting from trapped site, mixed income, all site utilities Dublin High School Gymnasium 1990 $2M – New
construction scheduled around classroom attendance Martinez High School Remodel 1990 $5M – Complete
site renovation and HVAC replacement PG&E Lobby Repairs 1990 – Earthquake
repairs, marble wainscoting, evening work only Terra Linda Embassy Suites, 1989 – 7 floors
concrete PT plus roof finished ahead of schedule w/RIF Cal-Trans I-101 Viaduct 1989 – Logistics,
false-work, seismic retrofit, PT seismic, traffic control Larkspur Landing Apartments 1988 – Wall
prefabrication yard, logistics, scheduling, inventory Navajo HUD housing $45M 1987 – Panelized
wall system, remote locations, road/site utilities Albuquerque Water Treatment Plant #2 1986 –
Acid drains/manholes, C&G, waffle SOG, steel building UNM Medical School Cancer Treatment
Facility 1985 – Glass/acid SS, MEP, wide range of lab FFE Site Representative: Kirtland Air Base SECOM / DOE
Compound Secure Communications Building & renovation sites $7M, 1985
– High/low pressure steam, chill units, exchanger, TI, raceways, paving Computers:
Total Station, MS-Access, Excel, Project, PowerPoint, Prolog, Sure-Trak,
Timberline, Primavera P3, Expedition, A+ & Net+ Certification, ACES
CQM-RMS, Quest, CISCO, AutoCAD. Licenses:
ACE CQM-RMS – Flow Serve Pump Technician – GE Turbine Technician – Gas and
Steam Power Generation – Rigging – Hytorc – International Crane Signaling –
Roto-align – GB-98 New Mexico General Contractor: Commercial – LEED
Certification (AP in process) – ACI Concrete Flatwork Technician – Forklift
Operator & Rough Terrain, Man-lift operators training certificate, CPR,
FIRST AID, 16 Hour & 30 Hour OSHA no expiration date – Awards:
Phi Theta Kappa Honors
Society 2003; KPMG Grant 1998; Research Travel Grant 1996; Dean Harvey
Scholarship1994; Deans List 1992/93 Volunteer:
Taos Search & Rescue Team, 2004; Student Health Insurance Policy Review
Committee 1997; Student Research Travel Grant Review Committee 1997; Steve
Baer two stories Zome, UNM Architecture Dept. 1972; KUNM campus radio station
volunteers Training programs completed: Millwright
rigging, gas / steam turbines, machine alignment, conveyors, Clean room technician, Unistrut
wall assembly, Leadership Training Module with SureTrak, Total Station with Leica &
TOPCON, Commercial Door & Hardware, Estimating Commercial & Residential
with Timberline, Digitized Estimating for Earthwork with Quest, OSHA, Welding
Certification, Steel Stud Technician, Interior, USG Wall Partition &
Ceiling Systems, Have
Passport, Will Travel |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|